16 September, 2019

The conductor platform (mini-platform) is designed for drilling wells to develop the field reserves. The second drilling stage of the field development is planned for October 2019.

In addition to the technological equipment, the conductor platform has been equipped with safety systems; premises for temporary stay of maintenance personnel and a helipad. The operation of the platform is heavily automated; there are only 10 workplaces.

Oil will be pumped to the main platform for preparation and subsequent shipment through the system of underwater pipelines.